Download CTMRD Maps & Reports

A variety of maps and reports related to the Central Truckee Meadows Remediation District (CTMRD) program are included here. All downloads are in Portable Document Format (PDF). PDF files can be viewed using Adobe's free Reader software.

Download free Adobe Reader

CTMRD 2011 Report Brochure

The CTMRD 2011 Report Brochure provides a snapshot of the CTMRD program including information on PCE and the local PCE groundwater problem. It highlights key annual accomplishments and provides general program information including a map of the Remediation District. The report is intended to be printed double-sided on 21x30" paper and folded down into a 7x10" brochure.

Remediation Management Plan (RMP)

The Remediation Management Plan (RMP) is the CTMRD program's guiding document. 

CTMRD Staff Report

To review the most current staff report, please the links below.

For previous years, please click the link below.

CTMRD Staff Reports Archives

CTMRD Service Area & Contaminant Boundary Maps

These maps illustrate the CTMRD Service Area and Contaminant Boundaries.

The most recent maps are listed below.

For previous years, please click the link below.

CTMRD Service Area and Contaminant Boundaries Maps Archives

CTMRD Fee Schedule

To review the most current staff report, please click the link below.

For previous years, please click the link below.

Final Fee List Archives

Groundwater Monitoring Plan Report

The Groundwater Monitoring Plan (GMP) Report summarizes the methods, results, and findings related to CTMRD groundwater sampling. The report includes the current understanding of groundwater and contaminant movement in the central Truckee Meadows, an inventory of data gaps in that understanding, and a summary of planned and recommended activities to address those gaps. Please click the link below to view the most recent Groundwater Monitoring Plan Report. 

Groundwater Monitoring Plan Quarterly Reports and Maps

CTMRD's Well Network Map indicates both municipal water supply (production) wells and monitoring wells.

Quarterly sampling details are illustrated in a series of maps created for the first and second quarters (January – June) and the third and fourth quarters (July – December). The most recent maps are listed below.

Click the year you are interested downloading/viewing. You will be directed to a separate page.

For additional questions or data requests, please use our Washoe311 online to fill out our online service request form.

For Immediate Assistance

Dial 3.1.1 or 775.328.2003

Disclaimer:

All information in these maps is approximate only and is not intended as a guide for design or survey work. Reproduction and/or distribution of this data is not permitted without prior written permission from the Washoe County Community Services Department.

PCE/TCE contours reflect data from the time range noted. Where such data were not collected, the most recent data for those locations were used. Contours may not represent the exact extent of the contaminant in groundwater. Water elevation contours associated with pumping or recharging wells are dynamic and may not reflect actual piezometric surface over the entire time range noted.

Reproduction and/or distribution of this data is not permitted without prior written permission from the Washoe County Community Services Department.